Update on Eric Roper & Landmark Construction of Nashville

Image
My bathroom still has no wallpaper, no fixtures &  a hand mirror thumb-tacked to the wall - since June 2011 The situation with Eric Roper and Landmark Construction of Nashville, TN, just gets odder and odder. A couple of weeks ago, I was contacted by a woman whose older parents are pursuing legal action against Eric Roper and Landmark Construction because she says he performed the same kind of sloppy works with the same basic crew (Kenny and Frank) on her parents' house in 2010. I believe her parents suffered water damage during the Nashville flood as I did under my house. In my case it was followed by subsequent massive water damage when my washing machine hose burst in the night a few months later and pumped some 2500 gallons of water into my house. Like he did with me, Eric reportedly informed this family he was a licensed contractor. As he did with me, he allegedly told this family he would bring the documentation "another day" and never did. They were ...

Eric Roper of Landmark Construction in Nashville: PLEASE FINISH THE JOB

Image
 This is my small mirror thumb-tacked to the wall of the small bathroom that has been without wallpaper and most fixtures for MONTHS which I am waiting for Eric Roper of Landmark Construction (who has been paid in advance) to get out here and finish the job . I am still trying to get Eric Roper of Landmark Construction in Nashville to return phone messages and email, even though I see him on Gmail when I am on (because his chat icon turns green and I email him at those times: Jan. 30, Feb. 5). What do you do when a contractors isn't professional or courteous enough to return calls on a job he hasn't finished and was paid in advance to finish?  Perhaps posting a message on my blog will lend some weight to my attempts to communicate. I find it hard to believe Eric Roper of Landmark Construction in Nashville is still dragging his heels on a job he was hired to do the summer of 2011 and paid a deposit on at the beginning of September 2011. His men showed up randomly an...

Tile Update: Jan. 10, 2012

Image
I finally heard from Eric Roper at Landmark Construction of Nashville, TN today. In spite of my wishful thinking that a small tile job he was hired to do in July 2011, and paid in advance for much of in Sept. 2011, and which he began on Nov. 3, 2011... he's not coming back until Mon. Jan. 16, 2012! Landmark Construction will have taken MORE THAN ONE HALF OF A YEAR to do a small kitchen tile job. Surely that's some kind of a record. And I think they need to redo the section above the sink that was pieced together so badly.

Where Is the Landmark Construction (Nashville) Tile Guy?

Image
Once again I have wasted part of a day waiting for Landmark Construction in Nashville to show up to finish the small kitchen tile job they were hired to do in July of 2011 and started on November 3. It's been one delay after another since then, with one mistake after another added in for good measure. As I mentioned in my last post , when I asked the tile guy on Monday if he thought the 3 bad areas I found after the tile was laid were all the bad places, he said, "Oh yes. Those were the 3 places I found when we were laying the tile, so that was all of them." What? They noticed the three areas with missing and cracked drywall BEFORE they laid the tile and just put the tile up with large bad areas behind them hoping I wouldn't notice? The tile guy was supposed to finish this job on Monday and Tuesday of this week after repairing the drywall on Monday, but didn't have enough tile to finish the job, so he didn't come on Tuesday and had to come back on Wednes...

Electrical Issues in My Kitchen May or May Not Be Fixed

Image
My kitchen wall where appliances were removed during pack out Landmark Construction sent an electrician out today from Electric Bill's to check the mystery electrical problems I have experienced since the oven was put in incorrectly and the wiring was fried. He was nice as he could be, but I couldn't help but notice he would say one thing to me and another to Landmark when he had them on the phone. For instance, when I described the oven problems and he took a look at the old oven he said since I had such a major water issue that water/moisture could have easily gotten into the circuitry which he described as being housed in little "pockets." He said water could have not only have accumulated in those pockets and caused some corrosion to any exposed metal parts all the months the oven sat unused, but it could also have washed particles of grease and debris into the circuitry which might have accounted for some of the smoke I saw. Later when he was talking to L...

Tile Update Dec. 23: More Problems with Tile

Image
After posting photos yesterday,  I went in to look at my tile this morning before Eric Roper from Landmark Construction arrived. I pressed a place the looked a little off and discovered my tile pushed in much, much more than it should, Since it was next to a light fixture, I was able to peer behind the tile and discover a large section with NO DRYWALL behind it. I could reach part of my hand behind the tile from the fixture, and there was a large space of missing drywall several inches in both horizontally and vertically that I could feel, maybe even more space that I could not feel, with no drywall behind it. I found several other places where I could push the tile way in as well as three different mat sections that seemed to have space behind them where all the tiles could be pushed in. When I showed them to Eric at Landmark, he seemed surprised and said something to the effect that the drywall must have fallen away after they laid the tile, but I am hard presse...

Tile Update: Dec. 22

Image
The tile is coming along. Too bad this batch of tile doesn't have as much translucence and sparkle as the last batch which was installed poorly had. I was asked if the pounding and noise of tearing out the old tile was an inconvenience. I replied that, no, the noise wasn't an inconvenience, but the five-week wait sure had been. Tomorrow I am supposed to get grout... and hopefully -- an oven! Stay tuned! More at: Decking the Halls and Walls - Landmark Construction Is Finally HERE! Msg. to Eric Roper of Landmark Construction in Nashville Tips for Contractors: Top 10 Ways Not to Install Tile  

Decking the Halls and Walls - Landmark Construction Is Finally HERE!

Image
Eric Roper from Landmark Construction is finally here after 5 weeks of delay! As my readers may remember, I was left with no oven and a botched tile job as well as piles of tile, trash and debris in my kitchen when he stopped returning calls and never showed up after saying it would take 3 days to redo the tile. Now 5 weeks later, I won't have to look at this anymore!  This is what my kitchen looks like 3 days before Christmas:  Look at my festive snowy look! Don't be jealous! Maybe they will also remove the dishwasher and hardware soon that they left sitting in my driveway for the past couple of months: Nothing like having contractors working on a job a few days before Christmas which they should have completed before Thanksgiving, but at this point, I will take what I can get! I will definitely post the before and after photos to show how the tile looks after it is replaced as well as to document how long it takes to get this job finished and what ...

Msg. to Eric Roper of Landmark Construction in Nashville

Image
Hey, Eric Roper of Landmark Construction in Nashville! Please reply to my emails and phone messages so we can finish this job and correct the back splash problems you told me would take 3 or 4 days to finish -- 3 or 4 weeks ago!!! Let's get this project finished before 2012. Tips for Contractors: Top 10 Ways Not to Install Tile Update: Friday, December 30, 2011 Where Is the Landmark Construction (Nashville) Tile Guy? Once again I have wasted part of a day waiting for Landmark Construction in Nashville to show up to finish the small kitchen tile job they were hired to do in July of 2011, paid in advance for most of the job in Sept. and started on November 3. It's been one delay after another since then, with one mistake after another added in for good measure. Continued at: Where Is the Landmark Construction (Nashville) Tile Guy? Update: Tuesday, January 11, 2012 I finally heard from Eric today. In spite of my wishful thinking that a small tile job he ...

Tips for Contractors: Top 10 Ways Not to Install Tile

Image
Tips for Contractors: Top 10 Ways Not to Install Tile While I am not an expert on tile, I just watched the Laurel & Hardy of contractors try to install tile in my kitchen following the dual whammy of the Nashville flood in May 2010 and a flood in my house in Oct. 2010, and I learned a thing or two about how NOT to install tile compliments of the subcontractors at Landmark Construction in Nashville, TN. Places where the tile was too close for the grout The company owner came out and helped oversee the removal and replacement of the poorly laid tile, but the results were still not professional. I am still waiting to see how the situation will resolve and will certainly blog the results, good or bad. In the meantime, this article should help contractors and homeowners avoid some of the problems I experienced. After the first corrections were made there were still a lot of problems Read more at:  Tips for for Contractors: Top 10 Ways Not to...